DirectoryMix Web Resources » Article Details

NASA ISS On-Orbit Status 7 June 2008 - Read More

Date Added: June 08, 2008 06:52:01 AM
All ISS systems continue to function nominally, except those noted previously or below. ISS crew work cycle shifted another 30 min to the left: wake-up 6:02am EDT; sleep 9:02pm (Shuttle crew 30 min later: 9:32pm).

Category: Reference » Measurements and Units


No comments are posted yet


 
Name:*
Email:*
Website:  (optional)
Comment:*
(html and bb codes are filtered and not allowed)

Do the math:*CAPTCHA - Do The Math
 

Related Articles

From manual scoring cards to global positioning systems

From his vantage point in a glassed-in room high above Michigan International Speedway's start/finish line, Steve Lowery has a first-hand view of the evolution of NASCAR's timing and scoring.

Atlas Minerals Presents NI 43-101 Resource Estimate For Tres Chorreras

Atlas Minerals Inc. Atlas is pleased to announce the results of a National Instrument 43-101 Resource Estimate for the polymetallic deposit at its Tres Chorreras concession in Ecuador.

Echo Therapeutics Announces Positive Results of a Clinical Study of its Symphony

Echo Therapeutics today announced positive results of a clinical study of its Symphony Transdermal Continuous Glucose Monitoring System in patients with Type 1 and Type 2 Diabetes.

TDS Reports Third Quarter Results

Telephone and Data Systems, Inc. reported operating revenues of $1,304.6 million for the third quarter of 2008, an increase of 5.5 percent from $1,236.9 million in the comparable period one year ago.

CORRECTING and REPLACING NOVA Chemicals: Outstanding Operating Results - Outlook for Second Half Even Stronger

PITTSBURGH----In the table entitled "9. Reconciliation to United States Generally Accepted Accounting Principles," the number for the line item "Start-up costs" under "Six Months Ended June 30, 2008" should read "3" .